Factory source Water Oil Liquid Epoxy Coated Cast Iron Pipe/ Casing Pipe

Short Description:


  • MOQ Per Size: 2 tons
  • Min. Order Quantity: One container
  • Production Time: usually 25 days
  • Delivery Port: Xingang Tianjin Port in China
  • Payment Terms: L/C,D/A,D/P,T/T
  • Brand: YOUFA
  • Product Detail

    Product Tags

    We're commitment to offer the aggressive value ,remarkable products top quality, also as fast delivery for Factory source Water Oil Liquid Epoxy Coated Cast Iron Pipe/ Casing Pipe, For additional information and facts, please speak to us as quickly as possible!
    We're commitment to offer the aggressive value ,remarkable products top quality, also as fast delivery for Epoxy Coated, Epoxy Lined Steel Pipe, Liquid Epoxy Coating Steel Pipe, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.

    Product ASTM A252 Spiral Welded Steel Pipe Specification
    Material Carbon Steel OD 219-2020mmThickness: 7.0-20.0mmLength: 6-12m
    Grade Q195 = A53 Grade A
    Q235 = A53 Grade B / A500 Grade AQ345 = A500 Grade B Grade C
    Standard GB/T9711-2011API 5L, ASTM A53, A36, ASTM A252 Application:
    Surface 3PE or FBE Oil, line pipeWater delivery pipe
    Pipe Pile
    Ends Plain ends or Beveled ends
    with or without caps

    Strict Quality Control:
    1) During and after production, 4 QC staffs with more than 5 years experience inspect products in random.
    2) National accredited laboratory with CNAS certificates
    3) Acceptable inspection from third party appointed/paid by buyer, such as SGS, BV.
    4) Approved by Malaysia, Indonesia, Singapore, Philippines, Australia, Peru and UK. We own UL /FM, ISO9001/18001, FPC certificates


    learn more about certificates

    quality control

    Packing and Delivery:

    Packing Details : small sizes nested into big sizes. 
    Delivery Details : Depending on the QTY, normally one month.

    9 SSAW steel pipe production lines 
    Factories: Tianjin Youfa Pipeline Technology Co.,Ltd 
    Handan Youfa Steel Pipe Co.,Ltd;
    Monthly Output: about 20000Tons


  • Previous:
  • Next: