Galvanized steel scaffolding catwalk metal plank walk boards with hook

Short Description:


  • MOQ Per Size: 2 tons
  • Min. Order Quantity: One container
  • Production Time: usually 25 days
  • Delivery Port: Xingang Tianjin Port in China
  • Payment Terms: L/C,D/A,D/P,T/T
  • Brand: YOUFA
  • Material: Q235 steel
  • Surface Treatment: galvanized OR painted
  • Product Detail

    Product Tags

    scaffoldings board

    Scaffoldings steel plank

    steel plank Steel plank with hook/catwalk
    Size/mm Length/mm Width/mm Height/mm Kg/pc Size/mm length/mm width/mm height/mm kg/pc
    210*45*1.2 4000 210 45 13.6 500*50*1.2 1829 500 50 15.5
    210*45*1.2 3000 210 45 10.26 500*50*1.2 1219 500 50 12.5
    210*45*1.2 2000 210 45 6.93 480*45*1.2 1829 480 45 13.5
    210*45*1.2 1000 210 45 3.59 480*45*1.2 1219 480 45 11
    240*45*1.2 4000 240 45 14.87 450*45*1.2 1829 450 45 13
    240*45*1.2 3000 240 45 11.23 450*45*1.2 1219 450 45 10
    240*45*1.2 2000 240 45 7.59 450*38*1.2 1219 450 38 12.5
    240*45*1.2 1000 240 45 3.94 420*45*1.2 1829 420 45 12.5
    250*50*1.2 4000 250 50 15.67 420*45*1.2 1219 420 45 9
    250*50*1.2 3000 250 50 11.84 330*50*1.2 1829 330 50 11.5
    250*50*1.2 2000 250 50 8 330*50*1.2 1219 330 50 8.5
    250*50*1.2 1000 250 50 4.15 450*38*1.2 1829 450 38 12.5

    Products Advantages:

    1. larger capacity
    When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).

    2. Easy disassembly, erection and flexible
    Easy to adjust the length of the tube, fastener connection is simple,and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

    3.To compare the economy
    Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.

    Packing and Loading:

    Production Workshop and Warehouse

    scaffold workshop
    scaffold plank workshop
    steel plank factory
    steel plank warehouse

  • Previous:
  • Next: